Search This Blog

Friday 27 November 2020

Wings - Part X

Wings are moving along nicely.  All the top skins are on.... just a few rivets to go on the right wing.  Left wings is complete.






All of the wiring has been tidied up and tied down.  Pitot was installed (and removed again).  Fuel pumps installed and tightened.  All 6 wing skins are on, and 5 are completely riveted.

Nut plates installed for the folding wing supports



One wing complete!

Up next...
  1. Finish right wing inboard panel
  2. Leak test tanks (I have started this, working on methods currently)
  3. Install tanks and filler necks
  4. Attach fuel and vent lines on all tanks
  5. Install root and tip ribs in both wings
  6. Cove skins
  7. Wings done!
Goal is to have all of the above done by end of year...