Search This Blog
Monday, 15 September 2025
Keep on truckin...
Sunday, 7 September 2025
Progress... getting on a roll.
Tuesday evening... (Sept 2, 2025)
Pin keepers installed in the stab / elevator / trim. THAT was a challenge solo. Thank god for the body work stand. I use that thing ALL THE TIME.
I was flying solo tonight, so had to get inventive on how to hold the elevator up. Tape worked!
Peeled a lot of tape off the front window... looks reasonable, but not perfect. I think I can fix the problem areas. Also got some silpruf on the interior, but it is coming off with a bit of effort. Forgot to take a pic. 2 days until the clecos come out.
On the last engine run the pipe off the turbo had a shake. It was only supported with 1 mount, and its a long pipe. Added a second mount at 90 degrees (roughly). I think this will work. It is definitely less 'shakey' just wiggling it.
That was a 3.5 hour evening. But it was definitely progress.
Front window came out of the clamps!
Looks pretty good.
Put lock nuts on the new exhaust clamp... I found some.
Installed Deutsch connector under the tail cone for the rudder trim. The bulkhead connector finally arrived from China.
Next was the bead of silpruf between the window and fuselage. Lots of cleaning of crap out first... my theory is to get all the leftover crap out. The 'dressing' needs to stick on all 3 sides. So lots of pulling out the leftover bits (I could have done a better job during the insertion of the window... being honest). Then taping the gap...
Tuesday, 2 September 2025
Progress... and going backwards.
Positives and negatives this week.
Clear was shot on a ton of parts yesterday. Struts, flaps, right wing, elevator, spinner, etc. Most of it looks good, but the wing does not look good. One side is flat and orange peel. Not sure what the plan is at this point.
So I got to work on the fuselage. I have the rudder and stab, so getting everything in the fin and aft fuselage ready. Everything is torqued, torque sealed, cotter pinned, etc. Elevator bell crank, rudder hinge bolts, tailwheel, etc. And I cleaned... and cleaned.
The front window looks like its going to be good. Peeled a bit of tape away to peek.
Monday, 20 January 2025
Tail 'stuff'... and other 'stuff'.
While waiting for my PFD and prop motor to come back (prop motor hasnt even shipped yet...), working on the tail.
Tailcone fasteners are riveted in. Elevator fairings are on, minus a few fasteners I am waiting for. Rudder fairing is on. Rudder base fairing is in process... I am over thinking this one.
Horizontal stab fairing fasteners are on, still need to bond the two pieces together.
Need to make the tabs for the pins.
Another builder is going to machine me a new rudder hinge that is offset. Need to rivet the stop to the yoke of the rudder. Hinge is complete as of Jan 20, 2025... just waiting for it to arrive.
PFD is back and installed. Funny story... there was a USB stick in the rear USB port on the display... and I think to myself, someone forgot to take it out. So I take it out and put it in my pocket to return. THEN I read this instructions that came in the box... they upgraded the software, and I need to upgrade the OTHER display and all the devices on the skyview network. OK - will do that tomorrow I tell myself. Then I couldnt remember where I put the USB stick. Finally found it... all upgraded and done.
Pitch change motor has arrived in New Zealand. Hoping for a week turn around.
Cut the holes in the fuselage for the flap tracks to go... that was fun! NOT. The fiberglass there is REALLY thick.
Installed the eyebolts in the wings, and drilled the rivets, installed the doublers, and the eyebolt on the vertical fin. Wings are now properly stowed. Having the wings swung back makes the tail REALLY heavy. The T3 suspension certainly felt it.
Next is fuel lines from the wings to the fuselage!
Turned the engine over with 1 set of plugs out. Took a good 60 seconds to see any oil pressure. But it came up to 80 PSI on the starter alone. Still need to install and clamp the breather exit. Hose procured.
Tuesday, 10 December 2024
Horizontal Stab, Elevator Fairings, Tail Cone, Elevator Trim
The Sportsman has been in the hangar for a couple months... progress has been slooooow. But finally starting to pick up some speed.
There is so much to do... almost an overwhelming amount. So I finally decided to focus on the tail.
Elevator fairings:
Thursday, 12 October 2023
Wrap vs Paint - Wrap Test
I love wrap, and would like to use it to finish my Sportsman. However, there are a few challenges that I want to experiment with to see if wrap is viable - specifically control surfaces (ailerons, flaps, elevator, trim tabs). The challenge is the rivets along the trailing edge: The shop heads are square, and how will the wrap cling to them. I have asked multiple people that have wrapped their airplanes about this, and have never received a response. I think most people do not wrap the wings and control surfaces...
Paint is expensive. Lead times at shops are long. I am an average painter at best. Plus, best case is multiple months to get an aircraft painted.
I had some silver (White Aluminum) 3M 1080 wrap, and used that on my elevator trim tab as a test. The trim tab has been completed for years. All components were alodyned, and primed with zinc chromate. My plan is to wrap right on top of the primer.
The elevator trim tab is big enough to get an idea of how this will work, but small enough I can work on it solo.
Based on my wrap experience to date, I had the following expectations:
- Material would lay down easily.
- Dome head rivets should be minimal effort to get the wrap to conform
- Rivet tails will be the challenge on the trailing edges
- Protruding arms / tabs will be a challenge and require a separate operation, or paint.
- Corners / edges should be very doable
My first attempt was aborted as I messed up on the placement, and the wrap folded on top of itself - plus some stray fiberglass was on the table and got stuck to the wrap. The wrap came off no issues, and did not visibly disturb the primer. 4 hands is better than 2 during initial placement of the wrap.
The seam is on the forward side of the tab, top and bottom of the hinge. I layed the trailed edge down directly on the wrap and slowly worked forward on the top. Same process for the bottom, but I needed to slit the wrap around the arm.
As stated above, my expectation was the wrap would conform to the 3/32nd rivets no problem. That was NOT the case.
At first I tried the fingernail trick to get the wrap to sit down on the rivet. That kinda worked, but did not look great. I then bought this tool for getting fine detail to lay down. The air bubbles remained. Some times I could push them out, but most of the time no. Heat seemed to make it worse.... the heat would expand the air pocket and make the wrap very pliable, which made it prone to wrinkling.
At this point, the experiment is pretty much dead. Just for shits and giggles I tried a rivet tail, and as you would expect - no go.
Honestly, I have never had so many issues getting wrap to lay down. BUT - this is 1080 wrap, and usually we use 2080. So I have ordered some 2080 in the white aluminum colour - and will try again. The 1080 is definitely a no go, plus if I had to do each rivet individually I would go insane.
Received a did a quick test.
The rivet heads are really good using the RolleePro. The tails are better, but not great.
I saw on a YouTube video someone that put a straw at the end of the air channel to stop the vinyl from collapsing (as it tends to do when heated). That will be the next test.
Putting this exercise on hold... when I get closer will go to a pro wrap shop and get their opinion, but at this point unless they have a super awesome solution, the aircraft will be painted.
Friday, 25 August 2017
Elevator - Part III
- Bottom skins cleecoed
- Control horns cleecoed
- First trailing edge skin epoxied
| Bottom skins are finally on! And they won't be coming off... |
| Center section - including control horns - ready for riveting. Waiting for an offset / bent 1/8" snap to show up from Aircraft Spruce. |
| See - there really are two skins! |
| Trailing edge epoxied and clamped with aluminum L brackets and cleecos |
| Another view of the same - trailing edge clamped. |
- Exoxy left hand trailing edge
- Rivet control horn
- Pull rivets on aft skin holes, hard rivets on fore holes
- Then onto the trim tab!
Wednesday, 12 July 2017
Elevator - Part II
So I **THINK** my method for raising the elevator to leave the clecos in place worked.
I cut up some sections of 2x4 and clamped them to the front of the bench, then put additional blocks along the ribs and rear spar to lift the whole thing up. Used the level method, same as the Horizontal Stabilizer to check for level along the entire structure. It should be perfectly flat.
Control horn placement, ready for drilling.
Getting ready for the top skins. You can see my method to raise up the elevator to leave the top skins and clecos in place for drilling the other side.
Cutting the hole for the trim servo. NOTE: This is done per the manual, but the slot does not line up with the wiring harness coming out of the servo assembly. But, you an line it up, drop it in, and then slide it into place.
Disassembly and alodining, ready for primer.
Primed. I ws tired of hanging the parts and having to hold them while priming. The ribs are so light that they fly around under the spray, so I figured I would try a board. This is all parts of the wing crate chopped up. Worked OK - much better than hanging them from a wire, but still not ideal.
Riveting the doublers in place. A friend loaned me his pneumatic rivet squeezer. Wow... I squeezed all 88 rivets in less than 1 hour. I can't say enough about properly clamping all the parts in place prior to riveting. Sure makes a nice job.
End doubler on the main spar, all done. Turned out quite nice.
Rib A / B, with doublers in place.
Center section ribs riveted to the aft partial spar.
What's next:
- Rivet top skins
- Place counterweight ribs and rivet
- Flip over, rivet control horns in place, rivet bottom skins
At that point, the elevator will be put aside awaiting inspection before riveting skins to spar, and spar to ribs. Will get the trim tab assembled, but I anticipate that will be quick. Will be submitting the inspection paperwork in the next couple days.
.jpg)
