Assembly... ongoing.

Big day today (Tue, Oct 14).  Was laid off today, AND got my wings back on the Sportsman!




Such a great bunch of folks at Langley Regional Airport.  8 people showed up to help. 35 min start to finish.

And my friend flew his RV6A today for the first time.


Now I have clear runway for a TON of stuff to get done.

Fuel sender wiring underway, fuel lines connected, fuel filler necks installed, and antenna installed.


Crossover cables connected, but not yet tensioned.

Wing umbilicals fed through and connected.  Cleaned up the wiring for the inboard tank sensors.


First landing / taxi light installed.  Just need to put the pins in the connector (once I remember how I wired it... luckily I have documentation).

4 outboard strut attach bolts installed and torqued.  Total pain in the rear.  Using the clevis bolts inboard for tie down points.

Progress is so slow.... life is getting in the way - but I have a bunch of stuff I can work on.

Inboard delta wings installed.


Plan is the install the pins in the forward spar for good!

Flaps are connected.  Need to tweak the tension a bit, but everything works well.

Ailerons next.

Forward spar pins installed!



Lights attached and wired.


Pilot side door getting its final silpruf.



Spinner!


Lots more to come...


Sunday, 16 March 2025

Progress - week of March 10, 2025

Another week... 28 days to go until paint.


Monday, March 10 - 28 days to go

  • Flap track fairings... rivnuts installed
  • Outboard delta wings - drilled


Tuesday, March 11 - 27 days to go
  • Night off... other plans
Wednesday, March 12 - 26 days to go
  • Rudder base fairing.  Final trimming and fasteners installed.


Thursday, March 13 - 25 days to go
  • Fuselage inspection hole / cover (forward of tailwheel attach point)
  • Worked on the elevator and trim tab hinge pins.  They are very tight to insert.
Friday, March 14 - 24 days to go
  • Finished trimming starboard hatch cover and filler on seam
  • Bonded trailing edge of starboard wing tip
  • Ordered ELT and fire extinguisher.  Aircraft Spruce Canada wanted $400 CAD to ship.  Aircraft Spruce US was on $100 USD.  Robbery.
Saturday, March 15 - 23 days to go.  3 full weekends left.
  • Fasteners in all switch panels on the panel.  No need for any to come out except the breaker panel 
  • Starboard wing vent started.
  • Starboard aileron counterweight drilled.
  • Door seals fit
  • Antenna doublers in wing fabricated, drilled and primed.



Sunday, March 16 - 22 days to go
  • Riveted antenna doublers and mounted antennas properly
  • Found 6 missing rivets on the right aileron.  Fixed
  • Mounted aileron trim hinges pin retainer.
  • Right aileron mounted with new rod end (long story...)
  • Started pulling vinyl off the wing panels
  • Fixed pilot side door.  C clips kept popping off.  
  • Messed around with elevator trim tab.




Productive week