Tuesday, 2 September 2025

Progress... and going backwards.

Positives and negatives this week.

Clear was shot on a ton of parts yesterday.  Struts, flaps, right wing, elevator, spinner, etc.  Most of it looks good, but the wing does not look good.  One side is flat and orange peel.  Not sure what the plan is at this point.

So I got to work on the fuselage.  I have the rudder and stab, so getting everything in the fin and aft fuselage ready.  Everything is torqued, torque sealed, cotter pinned, etc.  Elevator bell crank, rudder hinge bolts, tailwheel, etc.  And I cleaned... and cleaned.

The front window looks like its going to be good.  Peeled a bit of tape away to peek.


Rudder installed, all cables connected with correct hardware, etc.

Prepping the stab and elevator for install.


Door seals installed.


Sheerwebs in the tailcone... these have been on the shelf for years.... What should I have been an easy job took hours.  The issue:  The SB that adds the reinforcing plate to the vertical fine (upside down pitchfork) moved the attach tabs back slightly.  So nothing fit correctly.  Had to open up the holes in the angle brackets on bulkhead C to adjust the alignment.  Lots of cursing involved in this one.


Mated up the stab, elevator and trim tab.  The pins went missing (again), but luckily had enough material left to make new ones.  I think this is the 3rd set I have made.


Still need to put the pin keepers in.  Then the whole assembly can be installed.

Should be getting more parts back this week.  The marathon continues...