90% done, 90% to go - be done on Tuesday

 It's a long list of what is left, but its getting shorter (last updated Sun, June 11).  This is to keep me focused and motivated.

Things to do at home
  1. Complete intercooler air inlets, and finish brackets
  2. Complete air cooler brackets, open hole in cowl, make mold, finish cowl
  3. Modify cowl for larger spinner
  4. Finish cylinder air inlets
  5. Exhaust - from UL stubs 
  6. Finish air outlet on cowl (exit air ramp)
  7. Plenum tops
  8. Plug wires, CHT and EGT
  9. All windows
  10. Brakes - from park brake valve to calipers
  11. Finish pitot lines
  12. Air intake / filter / alternate air source
  13. Cabin heat plumbing - firewall side
  14. Put doors on
  15. Finish mounting hardware for rudder and cables
  16. Fuel plumbing from gascolator to engine. Return line from engine to firewall
  17. Gear leg fairings
  18. Wing to fuselage wiring connector (fuselage side done)
  19. Install interior
  20. Glareshield upholstery
  21. Tighten up tailwheel bolts
Things to do at airport (final assembly)

  1. Strut to wing and strut to fuselage fairings
  2. Hang wings
  3. Finish hatches and flap fairings
  4. Wing tips
  5. Lights
  6. Wing to fuselage wiring connector (fuselage side done)
  7. Brake fluid / bleed brakes
  8. Wing mounted antennas / coax cabling
  9. Paint

I will probably keep this list updated as I think of more things and scratch some off.