Another week... 28 days to go until paint.
Monday, March 10 - 28 days to go
- Flap track fairings... rivnuts installed
- Outboard delta wings - drilled
- Night off... other plans
Wednesday, March 12 - 26 days to go
- Fuselage inspection hole / cover (forward of tailwheel attach point)
- Worked on the elevator and trim tab hinge pins. They are very tight to insert.
Friday, March 14 - 24 days to go
- Finished trimming starboard hatch cover and filler on seam
- Bonded trailing edge of starboard wing tip
- Ordered ELT and fire extinguisher. Aircraft Spruce Canada wanted $400 CAD to ship. Aircraft Spruce US was on $100 USD. Robbery.
Saturday, March 15 - 23 days to go. 3 full weekends left.
- Fasteners in all switch panels on the panel. No need for any to come out except the breaker panel
- Starboard wing vent started.
- Starboard aileron counterweight drilled.
- Door seals fit
- Antenna doublers in wing fabricated, drilled and primed.
Sunday, March 16 - 22 days to go
- Riveted antenna doublers and mounted antennas properly
- Found 6 missing rivets on the right aileron. Fixed
- Mounted aileron trim hinges pin retainer.
- Right aileron mounted with new rod end (long story...)
- Started pulling vinyl off the wing panels
- Fixed pilot side door. C clips kept popping off.
- Messed around with elevator trim tab.