Sunday, 23 March 2025

Progress - week of March 17

The push to get ready for paint is in full swing.

March 17 - 21 days to go

  • Starboard aileron counterweight slot and vent cut
  • End of wingtip sanded and made flush with the trailing edge of the aileron.
  • Sanded the seam... to get ready for a layer of glass.


Tuesday, March 18 - 20 days to go
  • Forced night off.  Crazy work day...
Wednesday, March 19 - 19 days to go
  • Zip... flying club meeting.
Thursday, March 20 - 18 days to go
  • Wingtip / aileron closeout started on both wingtips.  Foam cut, fit and bonded in.
  • Starboard fuselage to strut fairing roughed in and meeting up.


These suckers are a lot of work.  Put in on, mark it, take it off, trim, rinse and repeat.

Friday, March 21 - 17 days to go
  • More strut fairing.  Bolts are back in, holes cut.
  • Had lots of visitors... did not get much done.
Saturday, March 22 - 16 days to go
  • Thanks to Jim and Bruce, all the fuselage bolts are in and tight!  VERY GRATEFUL FOR THE HELP.
  • They also got all the fasteners in the hatch covers, and Jim started the starboard wing tip fasteners.
  • Weighed the plane.  She has gotten fat.  Need to check the numbers.
  • One layer of glass on the port wingtip closeout.  All temp holes have a fiberglass backing.  Added glass inside the port wingtip nose to fix the curvature problem.
Sunday, March 23 - 15 days to go
  • Thanks again to Jim for helping!
  • All nutplates installed for wingtips
  • Next round of filler on wingtips
  • Aircraft weighted again, but not in level attitude.  Weighed about 40 lbs less.
  • Covers for flap track pockets cut, fit and drilled.
  • Hatch covers installed.  Lower hatch cover holes drilled on port side.
  • Finished trimming port side strut fairing around tab for wing fold brace.  Reinstalled.