Its been about a year since the blog has been updated, so this will be a length post... lots have happened on the wings.

Where the last post left off was getting the spars on the jigs, level and plumb.

Root ribs

First step is to FIND the root ribs (mine were mislabeled).  They then have to be modified to fit.  The root rib webbing needs to be cut and fit into the ribs.


Both root ribs cut and fit and ready to be drilled.  Doublers need to be installed on the rib flanges. 




Fully assembled root rib 



Once they are fit and drilled, corrosion proofing (both Alodyne and Zinc Chromate) and riveted, and finally placed into the jigs. 



Assembling the nose, main, flap/aileron cove ribs into the jigs.



The main ribs outboard of the inboard fuel tank are doubled up.  No real fitting required, but they have to be drilled for riveting later. 


The strut beam components are all pre cut and do not require much work.  Simply corrosion proof them and install. 




This picture shows the bracing I built to hold the jigs in place.  As I have garage doors to work around, I glued them to the floor of the shop and then braced them to each other, and then to the walls.  1 year in they have not moved at all (plumb bobs on each corner to monitor for movement). 


Nose skins going on.  You can see the wood block hot glued to the spar and rib to hold it square.  The outboard ones are easy to adjust through lightening holes in the spar, but the mid and root skins are not so easy. 





To hold everything in place and line it up to the lines on the spar I used strips of plywood and clamps to position everything and hold it in place while drilling.


Installing the spar spar caps was fun.  They double up the spar in the mid section of the wing on the top spars.  They help tie the nose and main skins together and add strength. 


Forward holes drilled in the spar caps. 


Main skins going on. 


One side done! 



Stiffeners for the fuel tanks. 


Pitot static mast going on the left wing.  Rather than purchasing the Glasair kit, I simple bought a mount from Aircraft Spruce and will buy all my own hardware.

This plate will go on the inside of the wing and ties into the  skin stiffeners.  


Moved to the inside to drill the holes. 


Pitot static mast installed.  Nothing is riveted yet, but all the holes are drilled, dimpled and deburred. 


Drilling the primary spar attachment holes to the root rib.  I made a little jig to make this a bit easier. 




Thursday, 6 September 2018

Wing Jigs

After a relatively long ~9 month break, back at it.  The wing kit has been invading the basement for far too long.

First step is the wing jigs - and man, these are a project on their own.

The manual calls for them to be constructed out of standard 2x4 or 2x6 lumber, but after reading the forums building the jigs out of solid commonly available timber will lead to warpage.  So my solution was to buy 3 sheets of D grade 3/4" plywood and rip into 16, 5.5" wide strips and laminate these together to make a 16' long, 1.5" wide beam.



With the beams all laminated up, the next step is to get them into a framework.  I used standard 2x6's for the lateral supports.



For the posts that support the spars, the manual calls for 4x4 posts.  I again used 3/4" ply and made some box spars - glued and nailed.

The top is just 3/4" MDF.  4x8 sheet ripped in half.

I made the framework of the table 20" wide instead of 24", which will allow a 2" clamping area around the jigs.



Once leveled, the outside table legs are bonded to the floor.  I used a heavy duty tile glue.  Then the spar mounting brackets are fabricated and mounted on the posts.  

used a water level to align the top brackets on each side of the jig.  The garage floor has 3" of slope from end to end.  The table is quite level, but not perfect across the entire 16' span.


Spars mounted on the almost perfectly aligned jigs.  I will do final alignment prior to drilling the wing skins which is the most crucial part.

Onto the ribs!


Tuesday, 7 November 2017

Elevator Part IV - and Trim Tab

The elevator is completely riveted, except for the trailing edge, forward spar and hinges.  This will be done once the inspection is complete, which will hopefully be scheduled in the next week.

Next is the trim tab.  Honestly, I stared at this for quite awhile trying to figure out the best way to approach it.  Turned out to be very easy and straight forward.

Some of the ribs had to be straightened as they were slightly deformed.

The control horn needed to be fabricated out of some aluminum T stock.  I sure wish I had a bandsaw for this - I used a die grinder with a cutoff wheel.




Center lines were drawn on each rib.  I focused on the left hand edge rib first to position it correctly inside the skins (the manual is not much help here).  Once it had that one positioned correctly, I marked the top rivet location on each rib and clamped it in place.  Once one hole was drilled, I then clecoed it and lined up the center line on the rib and drilled the remaining holes.

Once I had a gameplan it went together very fast.




Everything stripped down, alodined and zinc/chromated.




Riveting this worried the hell out of me.  I know from experience that when you F*** up a skin, it takes a very long time to fix, and it never looks right.  You are better off to wait.  And it all comes down to the jig you build to hold it in place.  even more so with the trim tab as it has so little structure - especially the top skin.

So I finally went with the below jig.  2 long pieces of 3/4" ply (~1" wide") on the bench for the flanges to rest on.  A small wood block on top, and clamped the whole thing to the table.  I fed the trim tab forward as I riveted each rib.  Rivet gun on top, bucking bar on the bottom.




Worked well.  Didnt screw up any of the solid rivets.  The top is all solid rivets except the ribs where the control horn goes.  The bottom is ONLY solid rivets for the control horn and corresponding ribs.  Everything else will be 1/8" blind rivets.

Now it is onto the hinges.




Friday, 25 August 2017

Elevator - Part III




Summer's are SLOOOOOOWWW for building progress - BUT, I am getting a bit done.


- Top skins are riveted
- Bottom skins cleecoed 
- Control horns cleecoed
- First trailing edge skin epoxied

Bottom skins are finally on!  And they won't be coming off...
Center section - including control horns - ready for riveting.  Waiting for an offset / bent 1/8" snap to show up from Aircraft Spruce.
See - there really are two skins!

Trailing edge epoxied and clamped with aluminum L brackets and cleecos

Another view of the same - trailing edge clamped.
Todo list:
- Exoxy left hand trailing edge
- Rivet control horn
- Pull rivets on aft skin holes, hard rivets on fore holes
- Then onto the trim tab!

Wednesday, 12 July 2017

Elevator - Part II

It's been a month since the last post, and the elevator is moving along well, and it will hopefully be completed (ready for inspection status) in the next week or so.  Summer is busy with family stuff, but I have still managed to make progress.

So I **THINK** my method for raising the elevator to leave the clecos in place worked.



I cut up some sections of 2x4 and clamped them to the front of the bench, then put additional blocks along the ribs and rear spar to lift the whole thing up.  Used the level method, same as the Horizontal Stabilizer to check for level along the entire structure.  It should be perfectly flat.



Elevator control horns...


Control horn placement, ready for drilling. 




Getting ready for the top skins.  You can see my method to raise up the elevator to leave the top skins and clecos in place for drilling the other side.



Cutting the hole for the trim servo.  NOTE:  This is done per the manual, but the slot does not line up with the wiring harness coming out of the servo assembly.  But, you an line it up, drop it in, and then slide it into place.


Disassembly and alodining, ready for primer. 



Primed.  I ws tired of hanging the parts and having to hold them while priming.  The ribs are so light that they fly around under the spray, so I figured I would try a board.  This is all parts of the wing crate chopped up.  Worked OK - much better than hanging them from a wire, but still not ideal. 



Riveting the doublers in place.  A friend loaned me his pneumatic rivet squeezer.  Wow... I squeezed all 88 rivets in less than 1 hour.  I can't say enough about properly clamping all the parts in place prior to riveting.  Sure makes a nice job. 



End doubler on the main spar, all done.  Turned out quite nice. 



Rib A / B, with doublers in place. 



Center section ribs riveted to the aft partial spar. 



Top skins clecoed to the structure, ready to rivet.


What's next:
- Rivet top skins
- Place counterweight ribs and rivet
- Flip over, rivet control horns in place, rivet bottom skins

At that point, the elevator will be put aside awaiting inspection before riveting skins to spar, and spar to ribs.  Will get the trim tab assembled, but I anticipate that will be quick.  Will be submitting the inspection paperwork in the next couple days.


Tuesday, 13 June 2017

Onto the Elevator...

It has been too long since building.  Lots of other projects, work, and trips getting in the way.  

The wing kit is all safely tucked away in the basement - and getting that crate apart turned into a multi day effort - WOW.

The below pic is the elevator forward spar with the doublers clamped in place.


Pilot holes drilled for the doublers.



All doublers drilled.



All ribs, and partial ribs clecoed in place.



Center rib (A and B) doublers ready for drilling.



The centre section needs to be squared up before drilling the partial aft spar (where the trim tab goes).



Bottom right skin clamped in place ready for drilling.



Control horns drilled.  Still need to trim off the excess on the aluminum angle.



Bottom right skin drilled.  The clamping method I devised is working fine for the elevator, but will NOT work when I flip it over to drill the top skins.  I am going to try something similar, but with 2" blocks instead of 0.75".



Trim tab pushrod slot cut in left hand skin.  Once the pilot and main holes were drilled, I put 2 pieces of 3/4" plywood under each side of the slot and then clamped it to the work bench.  This gave me a relatively steady skin for dremmeling and filing.



Left hand skin in place, ready to drill.



Left hand skin drilled!



Left hand skin has a corresponding slot cut in it (using right hand skin slot as template).  Also, control horn attach angles are drilled into the spar, ribs and doublers.


Next will be modifying the table and clamping method to be able to flip the elevator upside down - but leave the clecos in place AND ensure it is level and without twist.  Fingers crossed...

Thursday, 20 April 2017

Horizontal Stabilizer Ready for Inspection, and Wing Kit Arrival!

Been awhile since I have posted... we took a nice holiday in California for 2 weeks in March, so progress has been slow.  BUT...

Horizontal stab is completely riveted on one side, and ready for MD-RA inspection.  It is safely put away until that milestone is ready.

Also, I have been working on the annual for the Emeraude - which is taking a fair bit of time.




The big news is the wing kit arrived today!




So here are some notes / hints for wing kit shipping / delivery - this is specific to Canada / transborder, but has some general notes as well:


  1. If you plan on picking the crate up from Glasair directly, you will get charged local (WA State) sales tax @ 9.1%.
  2. Glasair will arrange for shipping, which means dock to dock.  They will not setup delivery to your door / on the ground.  Unfortunately I was not informed of any of this until the kit was ready to go.
  3. Glasair / their shipper will arrange brokerage, but it is at a premium.  In my case, shipping was $600 USD, but shipping and brokerage was $1600.  I arranged brokerage for $275 Canadian (About $210 USD)
  4. After asking on the Glasair forum how guys have dealt with shipping in the past, they have had the crate sent to a shipping location that has a loading dock.  They then arranged for another shipper with either a flat deck or hiab crane to deliver the crate to its destination and drop it.  In my case, I had a flat deck deliver the crate and we just slid it off onto Harbor Freight / Princess Auto cheapo dollies.
Next is onto the elevator... but that will not start for a couple weeks.